SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021120267,"Santa Maria, City of",City of Santa Maria,,Park Edge Apartments Mixed-Use Project,NOD,6/16/2022,6/16/2022," The project includes a request for a Planned Development Permit to develop the 7.47- acre site with a mixed-use apartment and commercial use. This includes a request for 35% density bonus associated with the provision of affordable units to increase the allowable density from 104 units (14 units per acre) to 140 units (18.9 units per acre). The project also includes a requested modification of development standards for reduced setbacks of 10 feet between the southern half of the proposed apartment complex and Maramonte Park. The project would include 140 apartments, comprised of 128 market-rate units and 12 very-low income category affordable units, in eight buildings. The project would also involve development of amenities for use by onsite residents that include landscaped open space areas, a 2,680- square-foot (sf) community clubhouse, and a pool/spa. In addition to the proposed residential component, the project would include a 5,435-sf multi-tenant commercial building in the PD/C-2 zoned area of the project site. The building would consist of between one to three individual tenants, including a drivethrough restaurant. Access to the residential portion of the project would be provided from Miller Street on the north and Sunrise Drive on the south. Access to the commercial area would be provided from Santa Maria Way and Miller Street. The existing multi-purpose trail running through the center of the project site from Santa Barbara Drive to Santa Maria Way would be retained with development of the project. The project would provide 292 parking spaces. The project also would include two in-unit bicycle parking spaces per residential unit and 35 additional short-term bicycle parking spaces throughout the apartment complex. The project would also include three stormwater basins and landscaping throughout the commercial and residential areas of the project site.",https://ceqanet.opr.ca.gov/2021120267/2,Park Edge Apartments Mixed-Use Project,Cody Graybehl,City of Santa Maria ,Associate Planner,cgraybehl@cityofsantamaria.org,110 South Pine Street,,Santa Maria,CA,93458,8059250951 ext. 2552,34°54'34.5"N 120°25'58.3"W,Santa Maria,Santa Barbara,Santa Barbara,South Miller Street & Santa Maria Way,93455,7.47,"128-090-022, 128-090-023 & 109-010-039",101 & 135,None within two miles of the project site,Santa Maria Public Airport,,,,,,,,,,,,City of Santa Maria,Yes,6/15/2022,No,No,Yes,,Yes,Yes,No,Yes,"110 South Pine Street, Santa Maria, CA 93458"