SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021120102,Lake County,,,Leong - Pier and Deck Project (CE21-71),NOE,12/7/2021,12/7/2021,"The project proposes to remove 17 existing wood pilings and construct a 3x24 ft. ramp, 4x170 ft. pier with cable railing, 12x12 ft. covered deck, 3x12 ft. gangway, 12x12 ft. suspended swim platform. Project includes driving 21 new metal pilings. No littoral vegetation will be removed. Tules are present in the project area but the proposed structure will avoid tules so there will not be any impacts to the tules. All work in the lake will occur between October 15 and December 31. The project will not result in significant adverse environmental effects to wetlands or riparian habitats. The Lake County Community Development Department has determined that the project will not have a significant effect on the environment and is, therefore, exempt from the provisions of CEQA. ",https://ceqanet.opr.ca.gov/2021120102,Leong - Pier and Deck Project (CE21-71),Tracy Cline,"County of Lake, Community Development Department",Associate Resource Planner,tracy.cline@lakecountyca.gov,255 N. Forbes Street,,Lakeport,CA,95453,7072632221,,Lakeport,Lake,Lake,,,,008-005-15,,,,,,,,,,,,Categorical Exemption,Class 1 Existing Facilities - 15301 (d),"Class 1 – Existing Facilities. The project proposes to remove 17 existing wood pilings and construct a 3x24 ft. ramp, 4x170 ft. pier with cable railing, 12x12 ft. covered deck, 3x12 ft. gangway, 12x12 ft. suspended swim platform. Project includes driving 21 new metal pilings. No littoral vegetation will be removed. Tules are present in the project area but the proposed structure will avoid tules so there will not be any impacts to the tules. All work in the lake will occur between October 15 and December 31. The project will not result in significant adverse environmental effects to wetlands or riparian habitats. The Lake County Community Development Department has determined that the project will not have a significant effect on the environment and is, therefore, exempt from the provisions of CEQA.",,,,,,,,,,,,