SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021120067,"Chino, City of",City of Chino,,Well 11 Pipeline Alignment Project,MND,12/6/2021,,"The City of Chino proposes installation of a new 16” raw water transmission pipeline which would convey groundwater from the City’s Well 11 to the City’s Eastside Water Treatment Facility to remove 1,2,3 trichloropropane (TCP) and nitrate from the groundwater. The 16” pipe is intended to convey the raw water to the Eastside Water Treatment Plant (EWTF) for treatment. The Project consists of engineering, design, and installation of approximately 8,300 linear feet (LF) of 16-inch raw water transmission pipe from the existing Well 11 site, joining an existing 18” raw water transmission pipe at the ETWF. transmission pipeline which would convey groundwater from the City’s Well 11 to the City’s Eastside Water Treatment Facility to remove 1,2,3 trichloropropane (TCP) and nitrate from the groundwater. The 16” pipe is intended to convey the raw water to the Eastside Water Treatment Plant (EWTF) for treatment. The Project consists of engineering, design, and installation of approximately 8,300 linear feet (LF) of 16-inch raw water transmission pipe from the existing Well 11 site, joining an existing 18” raw water transmission pipe at the ETWF. ",https://ceqanet.opr.ca.gov/2021120067,Well 11 Pipeline Alignment Project,NATALIE AVILA,CITY OF CHINO,ASSOCIATE ENGINEER,NAVILA@CITYOFCHINO.ORG,13220 CENTRAL AVENUE,,CHINO,CA,91710,9093343406,34°1'47.6"N 117°39'32.8"W,Chino,San Bernardino,,San Antonio-Walnut-Cypress-Chino,91710,0.56,1051241780000,SR-60,Cypress Channel,,No,12/6/2021,1/4/2022,Water Facilities,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Transportation, Tribal Cultural Resources, Wildfire",,,,,,,,,,,,,,,,,