SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021120015,"SWRCB, Division of Drinking Water","State Water Resources Control Board, Division of Drinking Water",,Yorba Linda Water District Headquarters PFAS Water,NOE,12/1/2021,12/1/2021,"The project consists of the installation of a small treatment plant within the existing Yorba Linda Water District headquarters facility for the treatment of PFAS contaminants. The treatment plant would use an ion exchange (IX) treatment protocol using IX vessels and pre-treatment bag filters. A new be installed to accommodate the changed hydrologics introduced by the treatment facility. New pipelines would be installed within the property convey extracted groundwater to the treatment plant and to convey treated water to the existing potable water distribution system. The entire site has been previously distributed by the development of the existing headquarters facilities that includes and adminstration building, parking lot, ornamental landscaping and groundwater production well facilities, the Project would not require any new ground disturbances. The facilities would treat water pumped from the existing production wells and would convey it to exiting water distribution pipelines for potable water consumption. The Project would not require any native vegetation removal.",https://ceqanet.opr.ca.gov/2021120015,Yorba Linda Water District Headquarters PFAS Water,Sean F. McCarthy,SWRCB-Division of Drinking Water,Region Engineer,Sean.McCarthy@waterboards.ca.gov,"2 McArthur Place, Suite 150",,Santa Ana,CA,92707,7145584410,,Yorba Linda,Orange,Orange,"1410 Kimberly Ave. Fullerton , CA ",92831,,,,,,,,,,,,,,Categorical Exemption,"CCR, Title 14, Div. 6, Ch.3, Article 19, Sec. 15303: Class 3 New Construction or Conversion of Small Structures",None of the exceptions listed in section 15300.2 of the CEQA Guidelines would apply to the project.,,,,,,,,,,,,