SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021110149,San Bernardino County,,,Grove Basin Storm Drain ,NOE,11/9/2021,11/9/2021,"San Bernardino County Flood Control District (District) proposes to install approximately 6,000-feet of reinforced concrete pipe to connect Grove Avenue Storm Drain to Riverside Avenue Storm Drain and thus eliminate storm flow discharge from Grove Avenue. The proposed project will generally include but is not limited to: saw-cutting and removing existing asphalt pavement, excavating; installing RCP; manholes; junction structures; transition structures; replacing excavated material; asphalting and re-striping. Equipment planned for this project will include but is not limited to: Excavator; Dump Trucks; Dozer; Grader; Loaders; bobcat; water truck; bulldozer; generator; and a Crane. A traffic detour is planned which will route local traffic around construction to adjacent surface streets. No nighttime construction is planned. Construction activities are planned to occur within road right-of way and on previously developed and disturbed areas. Construction duration is anticipated for approximately 9-months",https://ceqanet.opr.ca.gov/2021110149,Grove Basin Storm Drain ,Arnold Gerber,San Bernardino County Environmental Management Division (EMD),N/A,Arnold.Gerber@dpw.sbcounty.gov,825 E. 3rd Street Room 123,,San Bernardino,CA,92415,9095202292,34°0'21.8"N 117°37'10.3"W,Ontario,San Bernardino,San Bernardino,Grove Avenue and Chino Avenue,91761,5.5,,,,,,,,,,,,,Categorical Exemption,"Class 1,15301 (b) and (c) Existing Facilities ",Project is a minor alteration to existing drainage facilities with no expansion of former use. (c) Project occurs on existing streets,,,,,,,,,,,,