SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021100098,Chaffey Community College,,,New Fontana Campus Master Plan,NOP,10/6/2021,,"The District proposes to implement the Chaffey College Fontana Campus Master Plan and relocate and expand the existing Fontana campus to the project site. The new campus would be developed in two phases over approximately 10 years and totaling 209,000 gross square feet (GSF). A welcome center/library, instructional building I, automotive technology building, and operations and maintenance building that total 137,000 GSF in Phase 1, and Phase 2 would develop a CTE building, instructional building II, and student and community center that total 72,000 GSF. All site and infrastructure improvements, including approximately 740 surface parking lots, two driveways, utilities, and plaza/green space would be constructed in Phase 1. The new campus would be developed with energy-efficient systems and sustainable building materials, infrastructure, and landscaping. Solar-panel parking canopies would be installed in the parking lots in support of the goal of net-zero-energy use. The buildings would be designed and oriented to reduce surface heat and create shades for campus pathways and open spaces. ",https://ceqanet.opr.ca.gov/2021100098,New Fontana Campus Master Plan,Samir Shah,"Measure P, Bond Program Manager",N/A,Samir.Shah@chaffey.edu,5885 Haven Avenue,,Rancho Cucamonga,CA,91737,9096526171,34°3'8.9"N 117°26'11.8"W,Fontana,San Bernardino,,Sierra Avenue/Underwood Drive,92337,14.3 ac,0255-101-05 through 09,I-10,None,None,Yes,10/7/2021,11/5/2021,Educational,Master Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,