SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021100034,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,Streambed Alteration Agreement No. 1600-2021-0020-R1 “Isinglass” Timber Harvesting Plan (THP) 2-21-00029-SIS,NOD,10/4/2021,10/4/2021,"The project is limited to twenty encroachments including construction of two new in stream drafting sites, construction of a new drafting site at a Class II spring, construction of four vented rock-armored fords (three will replace existing crossings and one will be new), construction of four rock fords to replace existing crossings, replacement of an existing corrugated metal pipe (CMP) with a dip, installation of two new dips to redirect the channel to its original location, installation of three armored critical dips to maintain existing crossings, clearing inlets of two existing crossings and installation of an energy dissipater at one of the crossings, and construction of a rock ford or vented rock ford to replace an existing CMP crossing, as identified and described on pages 42, 43, 44, 61, 68, 68-1, 68-2, and shown on pages 65, 66, 66-1, and 67 of the THP.",https://ceqanet.opr.ca.gov/2021100034,Streambed Alteration Agreement No. 1600-2021-0020-R1 “Isinglass” Timber Harvesting Plan (THP) 2-21-00029-SIS,Nicholas Simpson,Fish And Wildlife,N/A,nicholas.simpson@wildlife.ca.gov,619 Second Street,,Eureka,CA,95501,7076018401,,Mount Shasta,Siskiyou,Siskiyou,,,,,,,,,,,,,,,,,,,Department of Fish and Wildlife,No,9/23/2021,No,No,No,Timber Harvesting Plan,Yes,No,No,Yes,"The final EIR, Negative Declaration, or THP that was prepared by the Lead Agency for this project is available to the General Public at the office location listed above for the Lead Agency. CDFW’s CEQA Findings are available at the CDFW office identified above."