SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021090533,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,Butte Unit Chico Air Attack Base Generator Project,NOE,9/28/2021,9/28/2021,"This project will include installation of a concrete generator pad, stationary generator, automatic transfer switch and associated electrical equipment in underground lines on city property. Electrical lines in conduit will be laid in a trench that is approximately 12” wide, 36” deep, and 35’ long. Trenching will be located no more than 25’ from Air Base buildings that were constructed in the late 60s/early 70s. The Chico Air Attack Base is in an industrial park associated with an airport surrounded by grassland at an elevation of 251’. The airport runway is approximately 300’ from the Chico Municipal Airport runway. The topography is flat where the work will be done and gently sloping on the surrounding area. The soil is a clay loam that has been compacted and paved; some area of soil that has been capped with gravel may be impacted. Construction is estimated to take approximately 12 days.",https://ceqanet.opr.ca.gov/2021090533,Butte Unit Chico Air Attack Base Generator Project,Christina Snow,Department of Forestry and Fire Protection,N/A,christina.snow@fire.ca.gov,1131 S Street,,Sacramento,CA,95811,9163241639,,Chico,Butte,,Northrup Avenue,,,,,,,,,,,,,,,Categorical Exemption,"Class 1, Section 15301 Existing Facilities",The generator will be installed on an existing operational AAB within a developed air field. Minor disturbance will be required. ,,,,,,,,,,,,