SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021090311,Los Angeles Department of Water and Power,,,55th Street 24” Main Trunkline Replacement,NOE,9/16/2021,9/16/2021,"Notice of Exemption pursuant top CEQA guidelines Section 15302, Class 2 replacement and reconstruction. This document contains a NOE for the 55th St 24"" Main Trunk Line Replacement Project, a project map, and a project vicinity map. LADWP seeks to provide a reliable source of water to its customers and is in the midst of a program to replace aging and leaking infrastructure, including the 55th Street 24” Replacement (proposed Project). This project is in response to the 2018 55th St leak which was a catastrophic leak that caused some citizens to evacuate, a boil water notice, and some and property damage. Two new pipes will be installed from Western Ave to Compton Ave. One pipe is a 24"" steel pipe that will be replacing 19,500 linear feet of the current 55th St trunk line and the other is a 6-inch ductile iron running along the trunk line that the residents will be tapping off of. Project is expected to take from 2022 to 2027.",https://ceqanet.opr.ca.gov/2021090311,55th Street 24” Main Trunkline Replacement,Marshall Styers,Los Angeles Department of Water and Power,N/A,marshall.styers@ladwp.com,111 N. Hope St,Room 1044,Los Angeles,CA,90012,2133673541,33°59'28.3"N 118°14'52"W,Los Angeles,Los Angeles,Los Angeles,Intersection of S Western Ave and 55th St to intersection of Compton Ave and 57th St,90062,"19,000 linear ft",,I110,,,,,,,,,,,Categorical Exemption,"Section 15302, Class 2","In accordance with the California Environmental Quality Act, this project is Categorically Exempt from CEQA review pursuant to Section 15302, Class 2, which consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced, including but not limited to: (c) Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. The proposed project meets the requirements of these exemptions; therefore, no further CEQA review is required.",,,,,,,,,,,,