SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021080557,Lake County,,,Palisano Rip Rap Repair Project,NOE,8/27/2021,8/27/2021,The project proposes to repair an existing rock slope protection feature (rip rap) that has partially eroded and slumped leaving the shoreline vulnerable to erosion from wave action. The site is approximately 60 feet long. An estimated 5-8 tons of rock will be placed over the existing rip rap. No rock will be removed prior to replacement. No equipment will be on the lakebed. Material will be placed from the top of bank with an excavator.,https://ceqanet.opr.ca.gov/2021080557,Palisano Rip Rap Repair Project,Tracy Cline,County of Lake Community Development Department,N/A,tracy.cline@lakecountyca.gov,255 N. Forbes Street,,Lakeport,CA,95453,7072632221,,Clearlake,Lake,Lake,,,,036-481-05,,,,,,,,,,,,Categorical Exemption,A Categorical Exemption Class 1 Section 15301(d) – Restoration or rehabilitation of deteriorated or damaged structures.,"No littoral vegetation will be removed. All work will occur when water level is low and will not be bound by the local work window. No environmental impacts are identified. The project will not result in significant adverse environmental effects to wetlands or riparian habitats. The placement of the rip rap will reduce erosion of the bank from wind and wave action, thereby improving water quality. The Lake County Community Development Department has determined that the project will not have a significant effect on the environment and is, therefore, exempt from the provisions of CEQA.",,,,,,,,,,,,