SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021080099,Coastside County Water District,,,Water Line Replacement Under Pilarcitos Creek at Strawflower Village,MND,8/5/2021,,"The CCWD is proposing to replace the water line under Pilarcitos Creek. The existing 8-inch pipeline crossing beneath the creek is one of only two pipelines supplying water to areas of the CCWD south of the creek, including downtown Half Moon Bay. The existing pipe has reached the end of its useful life and a break underneath the creek bed would impair water delivery and could potentially damage the environment. A break in the water line would be difficult to detect, could cause potentially significant water loss, impair water quality, and cause liability to the CCWD with potential fines from the U.S. Army Corps of Engineers, Regional Water Quality Control Board, or California Department of Fish and Wildlife. The CCWD completed an initial phase of water line replacement work in June 2017 that consisted of installing approximately 400 ft of 8-inch pipe within the Strawflower access road from SR-1 that ensures water supply to commercial customers in the event of a problem with the existing pipe under the creek. The approximately 450-foot-long new pipeline would be installed using horizontal directional drilling under the creek from the Strawflower Village Shopping Center to Oak Avenue, with staging areas in the back of the shopping center and in Oak Park extending down Pilarcitos Avenue to the south. ",https://ceqanet.opr.ca.gov/2021080099,Water Line Replacement Under Pilarcitos Creek at Strawflower Village,Tali Ashurov,WRA Environmental Consulting,N/A,tali.ashurov@wra-ca.com,2051 Scott Street,Apartment 304,San Francisco,CA,94115,9259986283,,Half Moon Bay,San Mateo,,Oak Avenue and Strawflower Village Shopping Center,94019,,056-300-150 056-300-210 056-141-950 056-141-970 056-040-999,State Route 1,Pilarcitos Creek,,No,8/5/2021,10/4/2021,Other,Coastal Permit,"Biological Resources, Coastal Zone, Cultural Resources, Hazards & Hazardous Materials, Noise, Public Services, Transportation, Tribal Cultural Resources, Wildfire",,,,,,,,,,,,,,,,,