SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021080049,"Perris, City of",City of Perris,,Markham Street Truck and Trailer Storage Facility,MND,8/4/2021,,"Truck Terminal Properties, LLC (Applicant) is requesting approval of a Specific Plan Amendment, a Parcel Merger and Conditional Use Permit (CUP) for construction and operation of a truck and trailer storage facility to include a 700 square-foot single-story guard shack, 247 14-foot by 55-foot trailer stalls, three passenger car parking spaces and one handicap accessible parking space on a 9.5-acre property described as APN: 302-110-031 & 032. The Specific Plan Amendment is to change the land use designation of the Project Site, which is currently designated as Business Professional Office (PBO), to Light Industrial (LI) allowing for activities including manufacturing, research, warehouse and distribution, assembly of non-hazardous materials and retail related to manufacturing. Site improvements would include a mix of screen walls, block walls, signage, landscaping, and a storm water retention basin. Access to the Project Site would be provided by a 60-foot driveway at Markham Street. The Project would provide parking for local trucks and fleets. Truck drivers will either be picked up or dropped off by passenger cars. The Project will operate 24 hours a day and 7 days a week although security guards are not anticipated to be present 24 hours a day. Restroom facilities would be provided for both guards and truck drivers 24 hours per day.",https://ceqanet.opr.ca.gov/2021080049,Markham Street Truck and Trailer Storage Facility,"Chantal Power, Senior Planner","City of Perris, Development Services Department: Planning Division ",N/A,cpower@interwestgrp.com,101 North D Street,,Perris,CA,92570,9097541653,33°51'10.09"N 117°13'22.18"W,Perris,Riverside,,North side of Markham Street between Perris Boulevard and Redlands Avenue ,92571,9.5,302-110-031 & 032,,,,No,8/4/2021,9/2/2021,Industrial,"General Plan Amendment, Site Plan, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,