SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021070376,"Caltrans, District 4 - Bay Area/Oakland","California Department of Transportation, District 4",DOT,Los Gatos Creek Trail to Highway 9 Trailhead Connector,NOE,7/20/2021,7/20/2021,"The Town of Los Gatos proposes to construct two new connections to the Los Gatos Creek Trail from Highway 9. The Los Gatos Creek Trail is located along the east side of Los Gatos Creek. The project consists of three main components: (1) a southern trail alignment from University Avenue to Los Gatos Creek, (2) a clear-span, prefabricated bridge over Los Gatos Creek connecting the southern alignment to the existing Los Gatos Creek Trail, and (3) a northern alignment connecting the existing sidewalk on westbound Highway 9 to the Los Gatos Creek Trail. The northern and southern alignments would consist of new ramps providing pedestrian and bicycle access down to the trail. Retaining walls would be installed for the northern and southern alignments for support. The clear-span, prefabricated bridge would not have footings within the creek channel. The bridge and retaining walls would be within Caltrans right-of-way and, therefore, would be designed and installed per Caltrans guidelines.",https://ceqanet.opr.ca.gov/2021070376,Los Gatos Creek Trail to Highway 9 Trailhead Connector,Michelle Quinney,Town of Los Gatos,N/A,MQuinney@LosGatosCA.gov,41 Miles Avenue,,Los Gatos,CA,95030,4088273552,,Los Gatos,Santa Clara,Santa Clara,,,,,,Los Gatos Creek,,,,,,,,,,Categorical Exemption,"CEQA Section 15301, Existing Facilties",The project proposes improvements to an existing bicycle and pedestrian trail. No exceptions barring the use of a categorical exemption apply to the project.,,,,,,,,,,,,