SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021070194,"Fish and Wildlife, Region 3 - Bay Delta, Fairfield","California Department of Fish and Wildlife, Bay Delta Region 3",CDFW,"Storm Damage Repair, Bear Creek Road Project (Streambed Alteration Agreement EPIMS Notification No. CCA-14666-R3)",NOE,7/13/2021,7/13/2021,"The project is limited to the repair and stabilization of two creek bank locations, close in proximity, and the reconstruction of a partially collapsed roadway on Bear Creek Road caused by ongoing creek bank erosion. A 72-foot-long timber lagged soldier pile wall with traffic control features, including a guard rail and minor concrete vegetation control, will be constructed at the northern location. The southern location will be regraded and recompacted with engineered fill, yet also have a guard rail and minor concrete vegetation control installed. The repair will utilize portions of the damaged and existing fall line earthen drainage pattern. A new drainage system will be installed yet will connect to an existing storm water outfall. Excavated, regraded, and disturbed areas susceptible to erosion will be stabilized with rock slope protection, biodegradable erosion control features, hydroseeding, replanting, and minor pavement repair.",https://ceqanet.opr.ca.gov/2021070194,"Storm Damage Repair, Bear Creek Road Project (Streambed Alteration Agreement EPIMS Notification No. CCA-14666-R3)","Andrew Chambers, Environmental Scientist",CDFW,N/A,andrew.chambers@wildlife.ca.gov,"2825 Cordelia Road, Suite 100",,Fairfield,CA,94534,7074282002,,,Contra Costa,,,,,,,,,,,,,,,,,Categorical Exemption,15301,"The project consists of the repair of existing public street infrastructure with negligible expansion of use from its former footprint.",,,,,,,,,,,,