SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021070157,Three Rivers Levee Improvement Authority,,,500-year Flood Protection Project,EIR,1/18/2022,,"TRLIA is proposing to improve the Reclamation District 784 urban levee system to provide 500-year flood protection to southwest Yuba County. The project would reduce flood risk, ensure the system is adaptable to climate change, and address differing flood protection levels resulting from incremental construction and improvement of the system. Project components include improving 10 miles of existing levees south of the Yuba River, east of the Feather River, north of the Bear River, west of the Western Pacific Interceptor Canal (WPIC) and southeast of the Olivehurst Detention Basin. Approximately 3 miles of new levee would be constructed on the west edge of the Yuba Goldfields and to extend the WPIC West Levee to the north.",https://ceqanet.opr.ca.gov/2021070157/3,500-year Flood Protection Project Final EIR,Anne King,"GEI Consultants, Inc.",Environmental Compliance Manager,aking@geiconsultants.com,"Prospect Park Drive, Suite 400",,Rancho Cordova,CA,95670,9163827833,39°3'43.2"N 121°33'0"W,Marysville,Yuba,,"Plumas-Arboga Rd., Hammonton-Smartville Rd., Dantoni Rd., Simpson-Dantoni Rd.",95901,160,various,"20, 65, 70","Yuba, Feather, Bear rivers; Reeds Creek; Western Pacific Interceptor Canal",Yuba County,No,1/19/2022,3/4/2022,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",1/19/2022,3/4/2022,,,,,,,,,,,,,,,