SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021060444,"Parks and Recreation, Department of",California Department of Parks and Recreation,,Columbia SHP Interpretive Mining Panels,NOE,6/18/2021,6/18/2021,"California State Parks proposes to improve the visitor experience by installing three interpretive panels along the ADA pathway at Columbia State Historic Park. The panels are designed in a National Park System Style frame with in-ground mount and surface mount. All three panel frames will be installed and located in previously disturbed soil from recent trail construction along the trail edge. Project work is as follows: •Excavate up to 2.5’ deep x 1’ diameter to install frame post; each frame is supported by twoposts; •Backfill excavation with a base layer of gravel, followed by setting the posts in concrete andfinishing with a small layer of backfill; •Install three 48” wide x 24” high panels on exhibit frames.",https://ceqanet.opr.ca.gov/2021060444,Columbia SHP Interpretive Mining Panels,Andrew Collum,District Environmental Coordinator,N/A,Andrew.Collum@parks.ca.gov,22708 Broadway Street,,Columbia,CA,95310,2095362658,38°2'2.2"N 120°24'3.7"W,,Tuolumne,,,95310,,,,,,,,,,,,,,Categorical Exemption,Section 15304 and 15311,"Project consists of minor public or private alterations in the condition of land, water, and/or vegetation which does not involve removal of healthy, mature, scenic trees except for forestry or agricultural resources; and construction, or placement of minor structures accessory to existing institutional facilities included as ""Installation of signs"" in the Department of Parks and Recreation's list of exempt activities in accordance with CCR §15300.4.",,,,,,,,,,,,