SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021060389,"Caltrans, District 9 - Bishop","California Department of Transportation, District 9",DOT,Cemetery Pavement,NOE,6/17/2021,6/17/2021,"This project is located on U.S. 395 from 0.2 mile south of Cemetery Road, near the Mono Inn, to just before the junction with State Route 167, north of the community of Lee Vining, in Mono County. The project will involve pavement rehabilitation and HMA overlay with 3 feet wide shoulder backing placed along the entire length of the project. Striping, rumble strips, dikes, and metal beam guardrail will be replaced. Natina finish will be applied to the new guardrail. Some minor vegetation removal may be required but no trees will be removed. No utility relocation is anticipated. Stormwater best management practices will be implemented as required. All work will take place on existing facilities and in previously disturbed areas within the Caltrans right of way and/or operational easement on LADWP, Forest Service, or BLM land. Temporary construction easements will be required for staging at PM 57.1 and possibly to bring adjacent driveways to grade. No new right of way will be required. ",https://ceqanet.opr.ca.gov/2021060389,Cemetery Pavement,Ryan Spaulding,Caltrans District 9,N/A,ryan.spaulding@dot.ca.gov,500 South Main St.,,Bishop,CA,93514,7609371556,,,Mono,Mono,,,,,U.S. Route 395,,,,,,,,,,,Categorical Exemption,15301.Class 1(c),After a review of the project purpose. funding and locations it has been determined that no known environmental resources will be impacted by the project. ,,,,,,,,,,,,