SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021050619,"Palo Alto, City of",City of Palo Alto,,Corte Madera Reservoir Replacement Project,NOE,5/28/2021,5/28/2021,"The Corte Madera Reservoir is a 1.5 million gallon (MG), above ground, welded steel reservoir that was constructed in 1969 and is now reaching its useful life. This project will replace the existing reservoir with a new, above ground, pre-stressed concrete reservoir in the same location and with the same capacity. ",https://ceqanet.opr.ca.gov/2021050619,Corte Madera Reservoir Replacement Project,Darija Borkovic,Project Engineer,N/A,Darija.Borkovic@Cityofpaloalto.org,1007 Elwell Court,,Palo Alto,CA,94303,6505664507,37°22'38.6"N 122°11'13.7"W,Palo Alto,Santa Clara,Santa Clara,"1714 Arastradero Road, Gate B, Palo Alto, California",94304,0.12,APN 182-35-041,,,,,,,,,,,,Categorical Exemption,15302,The project includes the replacement of an existing utility structure (a 1.5 MG reservoir) with a new reservoir in the same location and with the same capacity.,,,,,,,,,,,,