SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021050221,Reclamation District 2092,,,Crows Landing Riverbend Preserve Habitat Restoration Project,NEG,5/12/2021,,"This Project will restore ecological processes and native riparian vegetation on approximately 195 acres of agricultural fields along the San Joaquin River. The primary goal of the Project is to improve connectivity and habitat quality for anadromous fish and other sensitive species. This will be achieved through improved floodplain inundation, frequency, and residence time; improved stream quality and habitat productivity; increased cool water refugia and improved food web productivity to benefit fish and other riparian-dependent wildlife. Project work will establish native vegetation, modify an existing farmer berm to reconnect historic floodplains and allow natural river process, and grade a swale to maintain flood conveyance and minimize fish entrapment risks. Reconnection of this acreage to the San Joaquin River will allow flooding for habitat benefits and transient floodwater storage. Native vegetation will be established using standard agricultural techniques including site preparation, drip and furrow irrigation, as well as chemical and mechanical weed control.",https://ceqanet.opr.ca.gov/2021050221,Crows Landing Riverbend Preserve Habitat Restoration Project,Maggie Blankinship,"Secretary, Reclamation District 2092",N/A,mblankinship@riverpartners.org,121 West Main Street,Suite H,Turlock,CA,95380,2098723744,37°27'34.9"N 121°1'59.11"W,"Modesto, Patterson",Stanislaus,,,95313,251.63,058-002-011,0,1,0,Yes,5/12/2021,6/10/2021,Other,Site Plan,"Biological Resources, Flood Plain/Flooding, Hydrology/Water Quality, Recreation, Tribal Cultural Resources, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,