SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021050036,Imperial County,,,Viking Solar Energy Generation and Battery Storage Project,NOP,5/4/2021,,"Construction of a 150 MW PV solar energy facility with an integrated, not to exceed 300MW, battery storage system on approximately 604 acres of land located 5.5 miles east of the City of Holtville within the County of Imperial. The Project site is designated and zoned for agricultural and recreation/open space use within the County of Imperial’s Renewable Energy Overlay Zone. The Project includes a ground mounted PV solar power generating system, battery storage system, substation, and switching station. The Electrical energy produced would be conducted through the proposed 230 kilovolt (kV) switching station and delivered to the Imperial Irrigation District’s 230 kV ""KN & KS"" line via a single overhead gen-tie line 120 feet in height. The Project proposes to utilize either thin film or crystalline solar PV technology modules mounted either on fixed frames or horizontal single-axis tracker systems. The proposed battery energy storage system would be constructed on the Project site and consist of either lithium ion or flow batteries. The batteries would either be housed in storage containers or buildings with a maximum height of 10 feet.",https://ceqanet.opr.ca.gov/2021050036,Vikings Solar Energy Generation & Storage Project/IID Electrical Upgrades,Diana Robinson,Planner III,N/A,dianarobinson@co.imperial.ca.us,801,MAIN STREET,EL CENTRO,CA,92243,4422651736,32°48'10"N 115°16'31"W,Holtville,Imperial,,East Nelson Pit Road and Graeser Road ,92250,604,"050-070-018, -019, -021",115,East Highline Canal ,Holtville Airport,Yes,5/4/2021,6/9/2021,"Other, Power",Use Permit,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Solid Waste, Transportation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,