SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040626,"Temecula, City of",City of Temecula,,"Filing of a Notice of Determination for Long Range Application No. LR21-0957 (PW11-10), Flood Channel Reconstruction and Repair Project located at Friendship Pa",NOD,8/3/2021,8/3/2021,"The erosion of the beds and banks are damaging and encroaching on the existing Friendship Park (Pala Community Park). The City is proposing to let Temecula Creek meander naturally within the vicinity of Pala Park, however, the City is also proposing to protect Pala Park and the recreational fields from future erosion. The project consists of installing a sheet pile wall, approximately 427 feet in length, and an associated anchor system along the northern boundary of the existing soccer field in Pala Park. This is to advise you that the City Council for the City of Temecula has approved the described project above on July 27, 2021 and has made the following determinations regarding this project: 1. The project will not have a significant effect on the environment. 2. That a Negative Declaration was prepared for this project pursuant to the provisions of CEQA. 3. Mitigation measures were made a condition of the approval of the project. 4. A Mitigation Monitoring or Reporting Program was adopted for this project. 5. A Statement of Overriding Consideration was not adopted for this project. 6. Findings were made pursuant to the provisions of CEQA.",https://ceqanet.opr.ca.gov/2021040626/6,PW11-10 Flood Control Channel Reconstruction and Repair,Nino Abad,City of Temecula,N/A,nino.abad@temeculaca.gov,41000 Main Street,,Temecula,CA,92590,9513086385,,Temecula,Riverside,Riverside,Temecula Lane and Canterfield Drive,92592,,"961450001,961450002",,,,,,,,,,,,,,,City of Temecula,Yes,7/27/2021,No,No,Yes,,No,Yes,No,Yes,"This is to certify that the Mitigated Negative Declaration with comments, responses, and record of project approval is available to the General Public at the City of Temecula, 41000 Main Street, Temecula, California, 92590 or https://temeculaca.gov/362/Environmental-Review-CEQA"