SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040415,Palo Verde Union Elementary School District,,,Palo Verde Union Elementary School District Water System Improvement Project,NOD,6/15/2021,6/15/2021,"The Project proposes to drill and construct a new domestic standard well (Well No. 3) for the school at the location illustrated in . The new well is expected to yield about 300 gpm. In addition to the construction of Well No. 3, the following items will also be constructed: • A 10,000-gallon pressure tank. The pressure tank will measure approximately 20 feet in height and approximately 30 feet in diameter and will be located at the new well site. • A gate valve with valve box • Backflow preventer • 15hp booster pump • 6 ft high chain link fence around new well and appurtenant facilities, with a 30-ft wide double drive gate. • 166 linear feet (LF) of new water distribution line (using open-trench method of construction installation) • 500-LF of new irrigation main to all valve boxes from the well. These Project components contained within the APE as defined above, are illustrated in Figure 2 2. In addition to constructing a well, associated infrastructure, and water pressure tank, the Project proposes to abandon the Well No. 1, per Tulare County standards and remove the associated existing 10,000 gal. water pressure tank, pump and electrical service. ",https://ceqanet.opr.ca.gov/2021040415/2,Palo Verde Union Elementary School District Water System Improvement Project ,Phil Anderson,Interim Superintendent,N/A,Phil.anderson@paloverdeschool.org,9637 Avenue 196,,Tulare,CA,93274-9529,5596880648,36°8'41.3"N 119°21'18.4"W,Tulare,Tulare,Tulare,Avenue 196 to the north and Road 96 to the west,93274,0.25 acres,174-150-025,99,Elk Bayou Ditch,Mefford Field Airport,,,,,,,,,,,,Palo Verde Union Elementary School District,Yes,6/9/2021,No,No,Yes,,Yes,Yes,No,Yes,"9637 Ave 196, Tulare 93274"