SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040328,"Chico, City of",City of Chico,,Salem Street Bridge Replacement Project,NOD,9/2/2022,9/2/2022,"The proposed Project will replace the bridge along the same alignment as the existing structure. The new bridge will accommodate two 12-foot travel lanes, 5-foot bike lanes, and 6-foot sidewalks. The profile will be lowered slightly, while maintaining the same bridge soffit elevation as the existing structure. The new bridge is anticipated to be a single span cast-in-place, post-tensioned concrete slab, approximately 70 feet long. Construction of the bridge will involve excavation for and construction of concrete abutments, situated on deep foundations. Other temporary work within Little Chico Creek includes removal of the existing structure, falsework erection and removal, and installation of scour countermeasures at the abutments. Little Chico Creek is a seasonal creek and construction is anticipated to proceed without the need for a temporary water diversion system. Construction of the roadway approaches will involve removal of existing pavement and placement of aggregate base and hot mix asphalt pavement. New curb, gutter and sidewalk will be constructed on the approach roadways and will connect with the existing pedestrian facilities. ",https://ceqanet.opr.ca.gov/2021040328/3,Salem Street Bridge Replacement Project,Lynn Coster,Central Valley Regional Water Quality Control Board,Senior Environmental Scientist,Lynn.Coster@waterboards.ca.gov,"364 Knollcrest Drive, Suite 205",,Redding,CA,96002,5302242437,39°43'26"N 121°50'10.7"W,Chico,Butte,Butte,,,,"004-289-001, 005-094-017, 005-094-016, 005-093-002, 005-093-003, 005-093-004, 004-288-014, and",,,,,,,,,,,,,,,Central Valley Regional Water Quality Control Board,No,9/1/2022,No,No,Yes,,Yes,Yes,No,Yes,The Initial Study/Mitigated Negative Declaration is available to the general public at: Salem Bridge Replacement Project - City of Chico (https://Chico.ca.us/salem-bridge-replacement-project).