SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040250,"Rohnert Park, City of",City of Rohnert Park,,City of Rohnert Park Water Infrastructure and Water Pressure Upgrade Project,NOE,4/9/2021,4/9/2021,"The proposed Project would replace water lines within the City's Right-of Way in the A-Section and B-Section neighborhoods, within existing disturbed areas. The original pipes are from the 1960's and are beyond their useful life expectancies. They serve the City's oldest neighborhoods.",https://ceqanet.opr.ca.gov/2021040250,City of Rohnert Park Water Infrastructure and Water Pressure Upgrade Project,Vanessa Garrett,Deputy City Engineer,N/A,vmarin@rpcity.org,6250 State Farm Drive,,Rohnert Park ,CA,94928,7075882251,,Rohnert Park,Sonoma,Sonoma,,94928,,,,,,,,,,,,,,Categorical Exemption,"Section 15302, Class 2, Replacement","The project is Categorically Exempt under Title 19 15302, Replacement or Reconstruction because the project consists of replacement of existing waterlines in the same site as the existing waterline and will have substantially the same purpose and capacity as the water lines replaced.",,,,,,,,,,,,