SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040193,"Caltrans, District 1 - Eureka","California Department of Transportation, District 1",DOT,Eureka Shoulders,NOE,4/7/2021,4/7/2021,"The Eureka Shoulders project is located on US Route 101 (Broadway) in the City of Eureka, between the South Bayshore Mall entrance and Henderson Street. The project proposes to increase shoulder width at three locations to improve safety for pedestrians and bicyclists. The first location includes approximately 400 feet of northbound shoulder located across from the Bayshore Mall. The goal at this location is to regain the original paved width of the shoulder, and an additional 1.3 feet, by removing the dike and placing the new dike at the edge of the shoulder. The second location includes approximately 125 feet of the northbound shoulder of Broadway across from Taco Bell. The goal at this location is to keep the hillside material out of the shoulder by placing a dike at the edge of the paved shoulder. The final location is on the southbound shoulder of the right turn pocket at the south Bayshore Mall entrance. The goal at this location is to create a consistent shoulder width for bicyclists’ safety by restriping the turn pocket parallel to the sidewalk.",https://ceqanet.opr.ca.gov/2021040193,Eureka Shoulders,Julie East,Caltrans North Region Senior Environmental Planner,N/A,julie.east@dot.ca.gov,1656 Union Street,,Eureka,CA,95501,7075720905,40°46'44.96"N 124°11'14.01"W,Eureka,Humboldt,,U.S. 101 / Henderson Street,95501,,,U.S. 101 PM/PM 76.08/76.65,,,,,,,,,,,Categorical Exemption,PRC 21084 and 14 CCR 15300.2,"Air, biological, cultural, noise, visual, water quality and hazardous materials reviews have been completed by qualified specialists. There are no anticipated impacts on these resources with the incorporation of measures identified for the project. ",,,,,,,,,,,,