SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040180,San Diego Unified Port District,,,Telecommunications Facility Modification by AT&T at Harbor Island,NOE,4/7/2021,4/7/2021,"The proposed project would involve modification of telecommunications equipment on an existing monopine by MD7 (Applicant), authorized agent on behalf of AT&T (Tenant), in the City of San Diego, California. Work to specifically complete the proposed project within the monopine would involve removal of six (6) existing panel antennas and fifteen (15) existing remote radio units (RRUs), and installation of six new panel antennas, twelve (12) RRUs, six dual mounts, six pipe mounts. The project would also include removal of one (1) 48VDC power supply and installation of one Ericsson baseband 6630 and Vertiv STD Netsure 721 power supply within the equipment room. Construction of the proposed project is anticipated to occur in April 2021 and would take approximately two (2) weeks to complete. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, significant impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater. ",https://ceqanet.opr.ca.gov/2021040180,Telecommunications Facility Modification by AT&T at Harbor Island,Michael Paul,San Diego Unified Port District,N/A,mpaul@portofsandiego.org,3165 Pacific Highway,,San Diego,CA,92101,6196868112,,San Diego,San Diego,San Diego,,,,,,,,,,,,,,,,Categorical Exemption,"Existing Facilities (SG § 15301) (Class 1), and Replacement or Reconstruction (SG § 15302) (Class 2)","The proposed project is determined to be Categorically Exempt pursuant to California Environmental Quality Act (CEQA) Guidelines Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction) and Sections 3.a. and 3.b. of the District’s Guidelines for Compliance with CEQA because it consists of replacement and reconfiguration of existing antennas and RRU’s on an existing monopine, would not result in a significant cumulative impact due to the continuation of the existing use, would be located on the same site as the structures replaced, and would have substantially the same purpose and capacity. The District has determined none of the six exceptions to the use of a categorical exemption apply to this project (CEQA Guidelines Section 15300.2). Sections 3.a. and 3.b. of the District’s CEQA Guidelines are as follows: 3.a. Existing Facilities (SG § 15301) (Class 1): Includes operation, repair, maintenance, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that previously existing. AND/OR 3.b. Replacement or Reconstruction (SG § 15302) (Class 2): Includes replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site and will have substantially the same purpose and capacity as the structure being replaced. ",,,,,,,,,,,,