SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040174,San Diego Unified Port District,,,Agreement with Kigt Inc. to Install and Operate Eight (8) Electric Vehicle Charging Stations in the San Diego Convention Center Parking Garage,NOE,4/7/2021,4/7/2021,"The proposed project would involve an agreement to install and operate eight (8) wall mounted electric vehicle (EV) charging stations in the San Diego Convention Center parking garage. The agreement would commence on October 6, 2020 for a term of five (5) years with the option for two 1-year renewals. The EV charging stations would be located within the underground garage adjacent to the 5th Avenue entrance, near the southeast end of level P1 and replace older technology previously installed but already removed from the site. Each proposed EV charging station has dimensions of approximately 4.13”x5.75”x2.24” and energy specifications of Level 2, 220V, 30 AMP, and 6.6 kW. One (1) of the eight (8) EV charging stations would be located in an ADA parking space. Installation of the eight (8) EV charging stations would occur within 60 days of execution of the agreement and be completed within two weeks by two to three workers. Installation activities involve attaching the units to the wall and running wires through the existing conduit to the power supply. There will be no trenching because all wires are external. The units would be in operation by early 2021. ",https://ceqanet.opr.ca.gov/2021040174,Agreement with Kigt Inc. to Install and Operate Eight (8) Electric Vehicle Charging Stations in the San Diego Convention Center Parking Garage,Michael Paul,San Diego Unified Port District,N/A,mpaul@portofsandiego.org,3165 Pacific Highway,,San Diego,CA,92101,6196868112,,San Diego,San Diego,San Diego,,,,,,,,,,,,,,,,Categorical Exemption,"Existing Facilities (SG § 15301) (Class 1), and Replacement or Reconstruction (SG § 15302) (Class 2)","The proposed project is determined to be Categorically Exempt pursuant to California Environmental Quality Act (CEQA) Guidelines Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction) and Sections 3.a. and 3.b. of the District’s Guidelines for Compliance with CEQA because the units are replacing previously installed EV charging stations with newer technology and will connect to an existing conduit. The District has determined none of the six exceptions to the use of a categorical exemption apply to this project because the proposed site is an existing underground parking garage that is not a particularly sensitive environment or a hazardous waste site; and the proposed project would not result in damage to scenic resources, would not cause a substantial adverse change in the significance of a historical resource, would not create a significant cumulative impact, and finally, would not have a significant effect on the environment due to unusual circumstances (CEQA Guidelines Section 15300.2). Sections 3.a. and 3.b. of the District’s CEQA Guidelines are as follows: 3.a. Existing Facilities (SG § 15301) (Class 1): Includes operation, repair, maintenance, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that previously existing, including but not limited to: 7) Existing facilities used to provide electric power, natural gas, sewerage, or other public utility service. AND/OR 3.b. Replacement or Reconstruction (SG § 15302) (Class 2): Includes replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site and will have substantially the same purpose and capacity as the structure being replaced. ",,,,,,,,,,,,