SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040127,ABC Unified School District,,,Solar Energy Project - Nixon Elementary School,NOE,4/6/2021,4/6/2021,"The District proposes to install solar energy arrays on three elevated carport-like structures (Structures A, B, and C) at Nixon ES. The solar energy structures would be comprised of metal columns and beams supporting array panels and installed as three elevated carport structures on the western and southern edges of the multipurpose field. Structures would be a minimum of 10-foot high and Structures A and B would each consist of 162 photo-voltaic (PV) modules and Structure C would consist of 278 PV modules, all tilted at a 7-degree angle. Structures A and B would each have the direct current (DC) system size of 68.040 kilowatts (kW) and Structure C's system size would be 116.760 kW, totaling 252.840 kW system size for the campus. Approximately 883 feet of conduit would be installed by directional borings from the solar arrays through paved lots and grass area to an existing electrical equipment box adjacent to the school buildings at the front of the campus. The project would also provide underground conduit for installation of car chargers in the future. However, installation of car chargers require additional funding and would not be installed at this time. The District and general community will benefit from a reduction in energy consumption and reduced energy costs.",https://ceqanet.opr.ca.gov/2021040127,Solar Energy Project - Nixon Elementary School,Ryan Carter,ABC Unified School District,N/A,ryan.carter@abcusd.us,16700 Norwalk Blvd,,Cerritos,CA,90703,5629265566,,Cerritos,Los Angeles,Los Angeles,,90703,,,,,,,,,,,,,,Categorical Exemption,"15301, 15303, and 15314","The project involves the construction of solar energy arrays on elevated structures. The proposed solar arrays will not result in an increase in student capacity or an expansion of existing use. No off-campus improvements will occur. Existing use of the facility as an elementary school will stay the same under the proposed project. Therefore, the project is exempt from CEQA under Sections 15301, 15303, and 15314. The proposed project was also reviewed for possible exceptions under Section 15300.2 and found that the exceptions do not apply. See Attachment to Notice of Exemption for further explanation of the evaluation, which is available at the ABC Unified School District Office, 16700 Norwalk Blvd, Cerritos, CA 90703.",,,,,,,,,,,,