SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040123,ABC Unified School District,,,"Solar Energy Project - Maintenance, Operations & Transportation Office",NOE,4/6/2021,4/6/2021,"The District proposes to install solar energy arrays on two elevated carport structures (Structures A and B) at MOT Office. Structure A and B would be installed in the central and northeastern parking lots, respectively. The carports would be a minimum of 13-foot high and consist of metal columns and beams supporting array panels. Structures A would have 210 photo-voltaic (PV) modules with direct current (DC) system size of 88.200 kilowatts (kW) and Structure B would have 102 PV modules with 42.840 kW DC system size, both structures tilted at a 7-degree angle. Therefore, there would be a total of 312 PV modules with system size of 131.040 kW. Approximately 283 feet of conduits would be installed by directional borings from the solar arrays through paved lots to existing electrical equipment box located in the office building to the northwest of Structure A. The project would also provide underground conduit for installation of car chargers in the future. However, Installation of car chargers require additional funding and would not be installed at this time. The District and general community will benefit from a reduction in energy consumption and reduced energy costs.",https://ceqanet.opr.ca.gov/2021040123,"Solar Energy Project - Maintenance, Operations & Transportation Office",Ryan Carter,ABC Unified School District,N/A,ryan.carter@abcusd.us,16700 Norwalk Blvd,,Cerritos,CA,90703,5629265566,,Artesia,Los Angeles,Los Angeles,,90701,,,,,,,,,,,,,,Statutory Exemption,21080.35,"The proposed project is exempt from further environmental review under the requirements of the California Environmental Quality Act (CEQA) (Public Resources Code §§ 21000 et seq.) because it is consistent with CEQA Section 21080.35, which provides that solar energy systems installed on the roof of an existing building or on an existing parking lot are statutorily exempt from CEQA. The proposed project involves the construction of a solar array mounted carport structures on the existing parking lot of the Maintenance, Operations, and Transportation Office, and the proposed project would not meet any of the exceptions specified in CEQA Guidelines Section 21080.35(d) through (f). See Attachment to Notice of Exemption for further explanation of the evaluation, which is available at the ABC Unified School District Office, 16700 Norwalk Blvd, Cerritos, CA 90703.",,,,,,,,,,,,