SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021040101,ABC Unified School District,,,Solar Energy Project - Bragg Elementary School,NOE,4/5/2021,4/5/2021,"The District proposes to install solar energy panels on two elevated carport-like structure (Structures A and B) at Bragg ES. Structures A and B would be installed along the border line of the turf field and the hardcourts north of the school building. Structures A and B would be a minimum of 10-foot high and comprised of metal columns and beams supporting array panels. Structures A and B would be located side by side, a slightly larger Structure A would be on the west side and Structure B on the east. Structure A would consist of 324 photo-voltaic (PV) modules tilted at 7 degrees angle, and Structure B would consist of 198 PV modules tilted at a 7-degree angle. The structures would connect to an existing electrical equipment box next to a school building in the front of the campus by installing approximately 583 feet of underground conduit through directional boring underneath the turf field, paved hardcourts, and concrete pavement (see Figure 2). Structures A and B would have direct current (DC) system size of 136.080 kilowatts (kW) and 83.169 kW, respectively, for a combined system total of 219.240 kW. The project would also provide underground conduit for installation of car chargers in the future. However, Installation of car chargers require additional funding and would not be installed at this time.",https://ceqanet.opr.ca.gov/2021040101,Solar Energy Project - Bragg Elementary School,Ryan Carter,ABC Unified School District,N/A,ryan.carter@abcusd.us,16700 Norwalk Blvd,,Cerritos,CA,90703,5629265566,,Cerritos,Los Angeles,Los Angeles,,90703,,,,,,,,,,,,,,Categorical Exemption,"15301, 15303, and 15314","The project involves the construction of solar energy array on elevated structures. The proposed solar array will not result in an increase in student capacity or an expansion of existing use. No off-campus improvements will occur. Existing use of the facility as an elementary school will stay the same under the proposed project. Therefore, the project is exempt from CEQA under Sections 15301, 15303, and 15314. The proposed project was also reviewed for possible exceptions under Section 15300.2 and found that the exceptions do not apply. See Attachment to Notice of Exemption for further explanation of the evaluation, which is available at the ABC Unified School District Office, 16700 Norwalk Blvd, Cerritos, CA 90703.",,,,,,,,,,,,