SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021030616,Pixley Public Utility District,,,Pixley Public Utility District: Water Main Extension Project ,MND,3/26/2021,,"Based upon a Feasibility Study prepared by Provost & Pritchard in August of 2020, the Project would consist of the following improvements: • A new 12-inch diameter pipeline crossing installed in a 24-inch diameter steel casing, in accordance with Caltrans Specifications under State Route 99 (SR 99), replacing an existing 4-inch pipeline crossing. Crossing will utilize jack & bore method. The existing 4-inch pipeline will be abandoned in place. • Interconnection of this new 12-inch undercrossing pipeline to existing distribution pipelines west of SR 99, at Main Street and East Court Avenue, utilizing open trench method. • A new 12-inch diameter water main installed east of SR 99 in North Park Drive replacing the existing 4-inch distribution line serving existing connections in the northeast area of Pixley. Installation will utilize open trench method. • Interconnection of the new 12-inch main east of SR 99 to existing pipelines serving the eastern area of Pixley, at North Park Drive and East Howard Avenue, utilizing open trench method. The interconnections of the new larger diameter crossing of State Route 99 would complete a “loop” which would allow for additional potable water supply reliability and reduce pressure issues which will benefit the water service. ",https://ceqanet.opr.ca.gov/2021030616,Pixley Public Utility District: Water Main Extension Project ,Roger Ward,"Pixley Public Utility District, Board President",N/A,pixleyppud@gmail.com,PO Box 535,,Pixley,CA,93256,5597573878,35°58'28.2"N 119°17'39.3"W,,Tulare,,"Main Street, North Park Drive, East Court Avenue",93256,,"299-011-009, 299-011-011",SR99,NA,NA,No,3/26/2021,4/26/2021,Other,,"Biological Resources, Cultural Resources, Tribal Cultural Resources",,,,,,,,,,,,,,,,,