SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021030426,"Regional Water Quality Control Board, Region 7 - Colorado River Basin, Palm Desert","California Regional Water Quality Control Board, Colorado River Basin Region 7 ",RWQCB,Oberon Renewable Energy Project,NOP,3/18/2021,,"IP Oberon, LLC, a subsidiary of Intersect Power, LLC, proposes to construct, operate, maintain, and decommission a 500 MW solar photovoltaic (PV) electricity generating station, battery energy storage facility, electrical substation, gen-tie lines and associated access roads on approximately 4,700 acres of BLM managed land in Riverside County, California. The proposed Oberon Renewable Energy Project would interconnect to Southern California Edison’s (SCE) 500 kV Red Bluff Substation via one new 500 kV gen-tie line. The proposed 500-kV gen-tie line would be located within one 175-foot ROW, running approximately 0.5 mile southeast from the solar facility, across BLM-administered land, to the SCE Red Bluff Substation. All of the lands within the Project application area are within the California Desert Conservation Area (CDCA) Planning Area, within the Riverside East Solar Energy Zone pursuant to the BLM’s Solar Programmatic Environmental Impact Statement and associated Record of Decision (ROD), and within a Development Focus Area (DFA) pursuant to the Desert Renewable Energy Conservation Plan (DRECP) and associated ROD.",https://ceqanet.opr.ca.gov/2021030426,Oberon Renewable Energy Project Final Environmental Impact Report,Logan Raub,Colorado River Basin Regional Water Quality Control Board,N/A,Logan.Raub@waterboards.ca.gov,c/o Aspen Environmental Group,"235 Montgomery Street, Suite 640",San Francisco,CA,94104,7607768966,,,Riverside,,,,,,Highway 177,,,Yes,3/18/2021,4/19/2021,Power,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,