SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021030193,"San Bernardino, City of",City of San Bernardino,,BNSF Ono Lead Track Extension Project,NOD,6/3/2022,6/3/2022,"The Project proposes to install a fourth lead track extending the existing A Yard lead track to two existing Ono Storage Sidings. A continuous lead track would be created, closing the existing gap between the Ono Storage Sidings and improving the flow of trains in and out of the A Yard. The Project does not propose to increase rail line operations; instead it would improve the A Yard’s operational efficiency by improving the A Yard’s ability to assemble and hold outbound trains, as well as move around railroad cars without obstructing mainline movements, reducing train congestion along the existing lead tracks and reducing train idling. The approximately 41-acre Project site consists of the existing BNSF corridor and adjacent properties where ground disturbances (including temporary construction staging) and/or property acquisitions would occur. The existing A Yard lead track would be extended by approximately 3.1 miles. Inclusive of the proposed extension, the lead track would total approximately 5.6 miles The proposed fourth lead track would be constructed within/along approximately 4.3 miles of the existing BNSF corridor generally from BNSF corridor generally from the BNSF overpass at State Street/University Parkway on the north to the existing SBD Intermodal. The existing A Yard lead track would be extended by approximately 3.1 miles. Inclusive of the proposed extension, the lead track would total approximately 5.6 miles. To accommodate the proposed improvements, the Project would require stormwater drainage/water quality, circulation/roadway, signal, sound walls, and utility improvements/modifications.",https://ceqanet.opr.ca.gov/2021030193/2,BNSF Ono Lead Track Extension Project, Oliver Mujica,City of San Beranrdino , Planning Division Manager,mujica_ol@sbcity.org,201 North D Street ,,San Bernardino,CA,92401,9093847272 ext. 3332,,San Bernardino,San Bernardino,San Bernardino,,92401,,,I-215,,,,,,,,,,,,,,City of San Bernardino ,Yes,6/1/2022,Yes,Yes,No,,Yes,Yes,No,Yes,"http://www.ci.san-bernardino.ca.us/, By request at the City of San Bernardino Planning Division, 201 North E Street, Suite 200, San Bernardino, CA 92401"