SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021020515,"University of California, Davis",,,California Hospital Tower Environmental Impact Report Mitigation Measure Modification,NOD,4/24/2023,4/24/2023,"UC Davis Health is constructing an approximately 909,000-gross-square-foot (gsf) hospital tower, referred to as the California Hospital Tower (CHT), and renovating 82,000 gsf in the Surgery and Emergency Services Pavilion for a total of 991,000 gsf of Department of Health Care Access and Information (HCAI) Level-1 space. UC Davis is also constructing Parking Structure 5 (PS5) immediately north and adjacent to the CHT project site, as well as associated make-ready projects and demolition of the East Wing of the main hospital. These projects were evaluated in the California Hospital Tower Environmental Impact Report (CHT EIR), which was certified by the University in November 2021. The proposed action modifies Mitigation Measure AQ-2a to require electric cranes to the extent feasible, and, in the event limited use of electric cranes are not feasible, to require use of other electric construction equipment to the extent necessary to create no new or increased significant impacts as compared to the CHT EIR.",https://ceqanet.opr.ca.gov/2021020515/8,California Hospital Tower Project,Heather Davis,"University of California, Davis",Interim Director of Environmental Planning,hddavis@ucdavis.edu,One Shields Avenue,Campus Planning and Environmental Stewardship,Davis,CA,95616,5307593766,,Sacramento,Sacramento,,Stockton Blvd and X Street,,,,,,,,,,,,,,,,,,Univerity of California,Yes,4/24/2023,No,No,No,Addendum #1 to the California Hospital Tower Environmental Impact Report (CHT EIR),Yes,Yes,No,Yes,https://environmentalplanning.ucdavis.edu/california-tower-project-final-eir