SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021020470,South Coast Water District,,,South Coast Water District Lift Station No. 2 Replacement Project,MND,2/25/2021,,"The South Coast Water District (District) proposes to replace Lift Station No. 2 that was originally constructed in 1953 with a new lift station along Country Club Drive in the City of Laguna Beach. In addition to the new lift station, the Project includes: the demolition of the existing lift station and facilities; the permanent realignment of a 1,000-foot section of Country Club Drive; the replacement of existing drainage outlet into Aliso Creek; installation of a new odor control scrubber; and, an intertie to connect the SCWD and City sewer pipelines to provide backup sewer capacity in emergency situations. The Project site encompasses approximately 1.2 acres along Country Club Drive in the City of Laguna Beach in southwestern Orange County. The Project site is located north of Aliso Creek, about 20 feet above mean sea level (amsl), approximately 750 feet east of the coast and 300 feet east of Coast Highway.",https://ceqanet.opr.ca.gov/2021020470,South Coast Water District Lift Station No. 2 Replacement Project,Michael E. Houlihan,ESA,N/A,mhoulihan@esassoc.com,"2121 Alton Parkway, Suite 100",,Irvine,CA,92606,7147425375,33°30'45.86"N 117°45'2.56"W,"Dana Point, Laguna Beach, San Juan Capistrano",Orange,,Coast Highway and Country Club Drive,92651,1.2,"056-240-61, 056-240-35, 056-240-36",Coast Highway,Aliso Creek,None,Yes,2/25/2021,3/29/2021,Industrial,"Coastal Permit, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,