SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021010196,United Water Conservation District,,,Oxnard-Hueneme System Backup Generator Project,NOE,1/19/2021,1/19/2021,The Oxnard-Hueneme System Backup Generator Project consists of the installation of a new backup diesel-powered generator at UWCD's El Rio Booster Plant which supplies UWCD's Oxnard-Hueneme (OH) system. The generator would automatically turn on in the event of a power outage to maintain supply of potable water via UWCD's OH system. An existing 750 kW diesel generator will be removed prior to installation of the new generator.,https://ceqanet.opr.ca.gov/2021010196/2,Oxnard-Hueneme System Backup Generator Project,Maryam Bral,United Water Conservation District,N/A,Maryamb@unitedwater.org,1701 N. Lombard Street Suite 200,,Oxnard,CA,93030,8055254431,,Oxnard,Ventura,,3561 North Rose Avenue,93036-1821,,,,,,,,,,,,,,Categorical Exemption,"15301, 15302","Based on an examination of the project, this project qualifies for the following exemptions under the California Environmental Quality Act: CEQA Guidelines section 15301, Existing Facilities: The project, including the installation of the new generator, consists of the minor alteration of an existing facility that provides public utility services (water), involving no expansion of use beyond that currently existing. CEQA Guidelines section 15302, Replacement or Reconstruction; The project consists of replacement and reconstruction of existing utility facilities, in this case replacement of an existing, inoperable generator with a new generator and related modifications at the El Rio Booster Plant, involving no expansion of capacity beyond that currently existing. It has been determined that none of the exceptions to exemption in CEQA Guidelines section 15300.2 are applicable.",,,,,,,,,,,,