SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021010175,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,Bradley Fire Station Generator Installation,NOE,1/15/2021,1/15/2021,"This project is located at the CAL FIRE Bradley Station at 65789 Bradley Road, Bradley, CA 93426. The project involves the installation of a DG50-2 Caterpillar generator and to provide electrical power to the facility in the event of a power outage. The generator measures approximately 7’ x 3.25’ x 4.5’ and weighs 2,110 lbs. A 9’ x 14’concrete footing will be poured to provide a level foundation for the generator. Existing propane tanks will be utilized to fuel the generator. Minor trenching will be completed at lineal distances of approximately 15’ to and at a depth of 30 inches to connect the propane tank to the generator and then the generator to the station electrical system. All project work will occur in areas that have already been developed and consist of existing infrastructure and structures. Project duration is anticipated to take 1-2 weeks.",https://ceqanet.opr.ca.gov/2021010175/2,Bradley Fire Station Generator Installation,Christina Snow,Department of Forestry and Fire Protection,N/A,christina.snow@fire.ca.gov,1131 S Street,,Sacramento,CA,95811,9163241639,,,Monterey,,Monterey Street,,,,,,,,,,,,,,,Categorical Exemption,"Class 3, Section 15303 New Construction or Conversion of Small Structures",The project is located on property that is developed with an active fire station. The generator installation is located on previously disturbed land and is an accessory/utility structure. ,,,,,,,,,,,,