SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021010058,Los Angeles Department of Water and Power,,,Valley Generating Station Demolition Project (Units 1-4 and Associated Structures),MND,1/7/2021,,"This document consists of both the Initial Study for the project and the MND. The Initial Study determined that the implementation of the proposed project could cause some potentially significant impacts on the environment but, as shown in the environmental analysis contained in this Initial Study/Mitigated Negative Declaration (IS/MND), all of the project’s potentially significant impacts would be reduced to less than significant levels through the implementation of mitigation measures. Consequently, the analysis contained herein concludes that an MND shall be prepared for the proposed project. The Los Angeles Department of Water and Power (LADWP) proposes to demolish Units 1–4 and associated structures and systems, the bearing cooling tower foundation, skim pond, and four concrete foundations of demolished cooling towers within the Valley Generating Station (VGS) (project or proposed project). The associated structures and systems adjacent to Units 1–4 that would also be demolished include the external connected turbine deck, circulating water piping connections, the oil water separator, the Fifth Street pipe trench, and the weld shop. The A/B Basins would remain in service, and the reverse osmosis (RO) trailer would not be demolished but would be removed from its current location. Units 1–4 were decommissioned in 2002, and the four cooling towers were demolished in 2017.",https://ceqanet.opr.ca.gov/2021010058/2,Valley Generating Station Demolition Project (Units 1-4 and Associated Structures),James R. Howe,Los Angeles Department of Water and Power,N/A,james.howe@ladwp.com,111 North Hope Street,Room 1044,Los Angeles,CA,90012,2133670414,34°14'37.8"N 118°23'36.9"W,Los Angeles,Los Angeles,,"Sheldon St/Glenoaks Blvd, Sheldon St/San Fernando Rd",91352,152,2537-021-903,"5, 170",Tujunga Wash,Whiteman Airport,No,1/7/2021,2/8/2021,Other,,"Biological Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Tribal Cultural Resources",,,,,,,,,,,,,,,,,