SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020120524,Lake County,,,Glenn Pier and Boatlift,NOE,12/29/2020,12/29/2020,"The project proposes to construct a new pier and covered boatlift associated with parcel # 060-022-01 @ 7655 Milos Court, Lucerne, CA 95458. The total combined area of the pier (4’x 40’), gangway (3’x 24’) and the covered boatlift (18’x 30’) is 772 square feet. Construction includes the installation of four (4) 8” pilings and six (6) 10” pilings, for a total of ten (10) pilings. There is an existing sea wall present.",https://ceqanet.opr.ca.gov/2020120524/2,Glenn Pier and Boatlift,Tracy Cline,County of Lake Community Development Department,N/A,tracy.cline@lakecountyca.gov,255 N. Forbes Street,,Lakeport,CA,95453,7072632221,,,Lake,,Cora Drive,,,,,,,,,,,,,,,Categorical Exemption,Class 3 New Construction - 15303 (e),"Class 3 – New Construction. The project consists of construction of a new pier, gangway and boatlift as an accessory structure to a residence. No littoral vegetation will be removed. All work in the lake will occur between October 15 and December 31. The project will not result in significant adverse environmental effects to wetlands or riparian habitats. The Lake County Community Development Department has determined that the project will not have a significant effect on the environment and is, therefore, exempt from the provisions of CEQA.",,,,,,,,,,,,