SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020120455,Sweetwater Union High School District,,,San Ysidro High School Track and Field Rehabilitation,NOE,12/23/2020,12/23/2020,"SUHSD is proposing to rehabilitate the existing track and field stadium facility at San Ysidro High School to improve the experience of student athletes, the student body, and visitor's to school sporting events. Project components would include the replacement of the existing infilled synthetic turf field and rubberized track surface with similar materials (an additional lane would be added to the track), replacement of existing stadium halogen light fixtures with light emitting diode (LED) fixtures, replacement of existing paving around the perimeter of the rubberized track with new paving, and replacement of the existing public address system (and additional of an emergency intercom). Compared to existing halogen fixtures, fewer LED fixtures would be needed to illuminate the playing surfaces and bleacher areas. New paving in the southwestern corner would extend to the area currently occupied by long and triple jump pits. Additional components include an Americans with Disabilities Act (ADA)-compliant path of travel with parallel handrailing alongside the existing Visitor's side bus turnaround/access road. The new path of travel would be illuminated by evening hours of stadium use by overhead lights and connect to an existing sloped accessible ramp that provides access to the field level from the top of bleacher area. Also, an additional paved sloped access ramp is proposed on the Visitor's side of the field and would connect to the nearby bus turnaround to the Visitor's bleachers. A new accessible walkway is also proposed to be constructed from the general campus parking lot located off Otay Mesa Road to the existing fire access lane to the north of the campus stadium. Lastly, minor updates to the existing press box and men's and women's restroom facilities are planned to ensure compliance with ADA requirements.",https://ceqanet.opr.ca.gov/2020120455/2,San Ysidro High School Track and Field Rehabilitation,Janea Quirk,Sweetwater Union High School District,N/A,janea.quirk@sweetwaterschools.org,1130 Fifth Avenue,,Chula Vista,CA,91911,6195854439,,San Diego,San Diego,,Airway Road and Caliente Avenue,92154,,6450603400 and 6450603700,"State Route 905, I-805, I-5",,Brown Field Municipal Airport,,,,,,,,,Categorical Exemption,"Section 15301, Existing Facilities (Class 1)","Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the time of lead agency’s determination (CEQA Guidelines Section 15301). The proposed project includes alterations to existing areas, facilities, and/or infrastructure of SYHS that are currently used for recreation and related access at the school. Minor alterations would include replacement of the existing synthetic field surface, rubberized track, field lighting (i.e., halogen lights would be replaced with fewer LED fixtures), PA system, pavement around the track, construction of ADA-compliant pathways, and installation of ADAcompliant features at the press box and men’s and women’s restrooms.",,,,,,,,,,,,