SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020110321,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,Alma Air Attack Base Relocation NOE,NOE,11/19/2020,11/19/2020,"The Alma Helitack Base (HB), currently located at 19650 Santa Cruz Highway in Los Gatos, is in the process of expanding operations. A new site has been located within the existing Moffett Federal Airfield (MFA) in Mountain View, California. Phase 1 includes a lease for space within Hanger N211 (3,160 sf). Apparatus Bay N248 would be used to store the Heli-tender vehicle and associative maintenance equipment with 3,000 square feet. Personnel needs will be partially addressed with existing office spaces within the Hanger N211. There are two vacant offices R176 and R178 (218 sf each) and these will be used by the pilots, crew members, and mechanics for varying logistical coordination requirements. Approximately 15 personnel on average (26 maximum) will utilize the site. No construction activities are being proposed for Phase 1 and existing utilities onsite will be utilized. Phase 2 consists of the installation of two prefabricated support modular trailers (1,440 square feet and 2,100 square feet respectively). Phase 3 consists of the installation of two barracks trailers (1,900 square feet each). All work being proposed will be on disturbed and developed land. Project activities are anticipated to commence in December 2020 and last approximately six months.",https://ceqanet.opr.ca.gov/2020110321/2,Alma Air Attack Base Relocation NOE,Christina Snow,Department of Forestry and Fire Protection,N/A,christina.snow@fire.ca.gov,1131 S Street,,Sacramento,CA,95811,9163241639,,,Santa Clara,,McCord Avenue ,,,,,,,,,,,,,,,Categorical Exemption,"Class 1, Section 15301 Existing Facilities",Leasing space within existing structures ,,,,,,,,,,,,