SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020110095,"Caltrans, District 9 - Bishop","California Department of Transportation, District 9",DOT,Inyo Digouts,NOE,11/5/2020,11/5/2020,Caltrans is proposing to construct pavement dig outs (cold plane and replace with HMA) at 2 different locations in Inyo County on Route 395.,https://ceqanet.opr.ca.gov/2020110095/2,Inyo Digouts,Kristopher Bason,Caltrans District 9,N/A,kristopher.bason@dot.ca.gov,500 South Main St.,,Bishop,CA,93514,7607844056,,,Inyo,,,,,,395,,,,,,,,,,,Categorical Exemption,15301. Class 1 (c),"After a review of the project and location it has been determined that no known environmental resources will be impacted by this project. All work will occur within Caltrans' right-of-way. Work at each location will be within the existing travel way. The dig outs will not expose the subgrade, will not extend into the paved shoulder, and will not require shoulder backing. Traffic will not be re-routed during construction.",,,,,,,,,,,,