SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020100228,South Coast Water District,,,Joint Transmi$sion Main (JTM) Improvements to Vault CM-10,NOE,10/13/2020,10/13/2020,"The Joint Transmission Main ( JTM) is a 60-inch water pipeline that was constructed in 1961 to convey potable water from a Metropolitan Water District (MWD) connection in Irvine, California to Bradt Reservoir and Schlegel Reservoir in San Clemente, California. Collectively, these facilities comprise the Joint Regional Water Supply System (JRWSS), a section of which is contract operated by South Coast Water District (""District""). The District plans to re-construct Vault C-10 to replace and upgrade the valves, flow meters, and electrical equipment. The vault is within a JTM easement in a vehicle parking area adjacent to Woodbridge Village Association Community Center, 31 Creek Road, Irvine, CA (Figure 1). JTM Vault CM-10is located beneath three vehicle parking spots and a grass median as illustrated in Figures 1 and 2. Existing surface features include an access manway and meter/electrical cabinet. When completed the surface equipment and access manway would be similar to the existing features. The staging area for construction would occupy several parking spots as illustrated in Figure 1. Construction is expected to take approximately four months. One tree would be removed for construction and landscape features of the parking median would be restored following completion of construction.",https://ceqanet.opr.ca.gov/2020100228/2,Joint Transmi$sion Main (JTM) Improvements to Vault CM-10,Rick Shintaku,SOUTH COAST WATER DISTRICT,N/A,,31592 West Street,,Laguna Beach,CA,92651,9494994555,,Irvine,Orange,,,,,,,,,,,,,,,,,Categorical Exemption,Section 15302 (Class 2) (c) categorically exempt replacement or reconstruction of existing utility systems and/or...,See NOD for full details.,,,,,,,,,,,,