SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020100083,San Diego Unified Port District,,,2020-092 Right of Entry License Agreement to San Diego County Regional Airport Authority for Site Inspection,NOE,10/6/2020,10/6/2020,"The proposed project is a Right of Entry License Agreement (ROELA) to the San Diego County Regional Airport Authority (Licensee) to enter six properties located in the city of San Diego, California. The area proposed for use under this ROELA would be used by the Licensee, and its authorized agent(s) and contractor(s), for the purpose of site inspections, assessments, surveys, and geotechnical and environmental studies, including soil borings and infiltration tests, as well as associated ingress and egress. The properties are not currently being used, but are improved (with paving and other minor structures) and were utilized for parking and other uses as recently as May 2020. The ROELA would have a total duration of approximately one (1) year, or would terminate upon completion of the Work, whichever occurs earlier. Due to its nature and limited scope, implementation of the proposed project would generate a minor amount of vehicle and truck trips and would require limited use of construction equipment. Vehicle and truck trips would be associated with transport of inspectors and equipment. Therefore, no significant impacts would occur. Any disturbed surfaces would be restored to pre-project conditions. Furthermore, the Licensee would be responsible for abiding by and conforming to all laws and regulations associated with the activities on or in connection with the above described premises, including hazards and hazardous materials and stormwater.",https://ceqanet.opr.ca.gov/2020100083/2,2020-092 Right of Entry License Agreement to San Diego County Regional Airport Authority for Site Inspection,Michael Paul,San Diego Unified Port District,N/A,mpaul@portofsandiego.org,3165 Pacific Highway,,San Diego,CA,92101,6196868112,,San Diego,San Diego,,,,,,,,,,,,,,,,,Categorical Exemption,SG §15301 Existing Facilities ; SG §15304:Minor Alterations to Land; and SG §15306: Information Collection,"The proposed project is determined to be Categorically Exempt pursuant to the CEQA Guidelines and the Sections of the District’s Guidelines for Compliance with CEQA as identified above. These are appropriate for the proposed project because it would consist of a ROELA for site inspections and assessments that would involve no expansion of use beyond that previously existing, would not involve the removal of mature, scenic trees, and would not result in a serious or major disturbance to an environmental resource. In addition, all surfaces disturbed by the proposed project would be restored to match the surrounding surface areas. The District has determined none of the six exceptions to the use of a categorical exemption apply to this project (CEQA Guidelines Section 15300.2).",,,,,,,,,,,,