SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020090420,"Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland","California Regional Water Quality Control Board, San Francisco Bay Region 2",RWQCB,Shell Alameda Distribution Center Remediation Project,FIN,11/20/2020,," On December 16, 1998, the Water Board issued Site Cleanup Requirements Order (Order) No. 98-121 due to soil and subsequent groundwater contamination. The Order did not include source removal activities or establish cleanup levels for on-site soil and groundwater contamination; therefore, a Remedial Action Plan (RAP) describes proposed contamination source removal activities. Remediation activities would include mobilization and staging of construction equipment; demolition and removal of existing on-site pavement, buildings, and other infrastructure; excavation, dewatering, import of clean backfill, compaction and re-grading; and demobilization. Construction activities would consist of the operation of heavy equipment; vehicle parking, and construction equipment and material storage; and heavy haul truck traffic along Grand Street, Clement Avenue, and State Route 61. These activities support the cleanup objectives summarized in the proposed RAP and support site closure. ",https://ceqanet.opr.ca.gov/2020090420/3,Shell Alameda Distribution Center Remediation Project,"Alyx Karpowicz, P.G.",San Francisco Bay Regional Water Quality Control Board,N/A,alyx.karpowicz@waterboardsca.gov,"1515 Clay Street, Suite 1400",,Oakland,CA,94612,5106222427,37°46'35"N 122°15'10"W,Alameda,Alameda,,Grand Street and Clement Avenue,94501,4.1,"72-381-1, 72-381-2",State Route 61,"Fortmann Basin, Oakland Inner Harbor, San Francisco Bay",Oakland International Airport,No,,,Other,Grading Permit,"Air Quality, Cultural Resources, Hazards & Hazardous Materials, Noise, Transportation, Tribal Cultural Resources",,,,,,,,,,,,,,,,,