SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020090237,Santa Clara Valley Water District,,,Palo Alto Flood Basin Tide Gate Structure Replacement Project,NOD,4/29/2021,4/29/2021,"Santa Clara Valley Water District (Valley Water) is proposing to replace the existing Palo Alto Flood Basin tide gate structure in order to maintain flood protection in the communities surrounding the flood basin and along the U.S. Highway 101 corridor. The Project would involve construction of a new 132-foot-wide tide gate structure slightly inboard (upstream) and southeast of the existing 113-foot-wide deteriorating tide gate structure, removal of the existing tide gate structure and levee, and construction of a new levee that ties into the new tide gate structure. Construction of the Project would occur in two phases with separate dewatering systems to allow continued operation of a tide gate throughout construction. Specific project elements include up to 2.3 miles of levee trail resurfacing (for access); installation of two sheet pile dewatering systems; construction of the new tide gate structure on a concrete foundation supported by drilled piles; demolition and removal of the existing tide gate structure and levee; and construction of a new levee connecting to the new tide gate structure. Construction would span up to 5 years but would be limited to September 1 through January 31 annually to avoid and minimize impacts on biological resources.",https://ceqanet.opr.ca.gov/2020090237/3,Palo Alto Flood Basin Tide Gate Structure Replacement Project,Alex Hunt,Santa Clara Valley Water District,N/A,ahunt@valleywater.org,5750 Almaden Expressway,,San Jose,CA,95118,4086303007,37°27'20.3"N 122°6'3.2"W,Palo Alto,Santa Clara,Santa Clara,n/a (Adobe Creek Loop Trail),94303,8.9,008-05-005,None,"San Francisco Bay, Palo Alto Flood Basin",Palo Alto Airport,,,,,,,,,,,,Santa Clara Valley Water District,Yes,4/27/2021,No,No,Yes,,Yes,Yes,No,Yes,https://www.valleywater.org/project-updates/creek-river-projects/palo-alto-flood-basin-tide-gate-structure-replacement-project