SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020090216,"Water Resources, Department of",California Department of Water Resources,DWR,California American Water Company- San Marino – Danford Well 1 (Replacement to Winston Well) Project (Project),NOE,9/10/2020,9/10/2020,"California American Water Company- San Marino proposes to replace a 915-gallon per minute, 378-foot deep Winston Well located at the Winston well site, with a 1,000-gallon per minute, 1,000-foot deep well, Danford Well 1, at the Danford well site. A 96-foot2, seven-foot tall chlorination building will also be installed on a 140-ft2 concrete pad at the Danford well site to house a chlorination tank, feed pumps, a residual analyzer, and interior lighting. A 16-foot2, two-foot deep catch basin will also be constructed. Four hundred eighty-five feet of half-inch to eight-inch diameter piping will be installed to connect the components to the system. A 48-foot2 transformer pad will be poured, and a transformer will be placed on it. An old switchboard will be replaced with a new 25-foot2 switchboard. Discharge tubing from the well and chlorine analyzer will also be installed to the storm drain system. The old Winston well will be destroyed. The project will provide chlorinated water to the existing system.",https://ceqanet.opr.ca.gov/2020090216/2,California American Water Company- San Marino – Danford Well 1 (Replacement to Winston Well) Project (Project),Dmitry Ginzburg,State Water Resources Control Board,N/A,,Hollywood District Office,"500 North Central Avenue, Suite 500",Glendale,CA,91203,8185512004,,,Los Angeles,,,,,,,,,,,,,,,,,Categorical Exemption,"Class 1 Existing Facilities (California Code of Regulations, Title 14, Division 6, Chapter 3, Article 19, Section 15301)","The well, chlorination building (chlorination tank, feed pumps, residual analyzer, and lighting), catch basin, transformer, and transformer pad consist of Class 3, the location of a limited number of new small structures in urbanized areas, (Section 15303 (c), < 10,000-ft2). These components may also fall under Class 1, Existing Facilities, addition to existing structures, (15301 (e), <10,000-feet, not environmentally sensitive).",,,,,,,,,,,,