SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020089022,"San Francisco, City and County of",City and County of San Francisco,,Potrero Yard Modernization Project (2500 Mariposa Street),NOP,8/19/2020,,"The project sponsor, the San Francisco Municipal Transportation Agency (SFMTA), proposes to replace the Potrero Trolley Coach Facility at 2500 Mariposa Street (Potrero Yard) in the northeast portion of San Francisco's Mission District near the South of Market and Potrero Hill neighborhoods. The proposed project would demolish the existing facility originally constructed in 1915 which has been identified as a historical resource for purposes of CEQA. The project is intended to accommodate the expansion of the SFMTA's transit vehicle fleet in a new replacement structure that would include space for bus parking and circulation (up to 213 buses); SFMTA maintenance, operation, and administrative uses; and joint development uses. The new, approximately 1,300,000 gross-square-foot structure would occupy the 4.4- acre site and rise to heights ranging from approximately 75 to 150 feet. The new structure would contain a three-level, approximately 75-foot-tall replacement transit facility (728,000 gsf) plus a mix of commercial (33,000 gsf) and residential uses (575 residential units and 544,000 gsf) in the remainder of the project as part of a joint development program between SFMTA and a private project co-sponsor. The joint development program would include a ground-floor commercial use and residential entry lobbies, with integrated residential and transit facility uses on the second through sixth floors of the three-level replacement transit facility. The majority of residential development would be atop the replacement transit facility on the 7th to 13th floors.",https://ceqanet.opr.ca.gov/2020089022/2,Potrero Yard Modernization Project (2500 Mariposa Street),Laura Lynch,San Francisco Planning Department,N/A,CPC.PotreroYardEIR@sfgov.org,"49 South Van Ness Avenue, Suite 1400",,San Francisco,CA,94103,6286527554,37°45'49.73"N 122°24'33.2"W,San Francisco,San Francisco,,"Bryant; Mariposa, 17th, and Hampshire Streets",94118,4.4,Assessor's Block 3971 / Lot 001,"I-280, U.S. 101",San Francisco Bay,,Yes,8/19/2020,9/17/2020,"Commercial, Other, Residential, Transportation","General Plan Amendment, Rezone, Site Plan, Use Permit",,,,,,,,,,,,,,,,,,