SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020080441,Yuba County Water Agency,,,Cottage Creek Dam Modification Project,MND,8/26/2020,,"The Proposed Project consists of removing the existing corrugated metal pipe spillway and downstream culvert, excavating a portion of the dam down to a lower elevation, and installing a large concrete box culvert that would be sized to pass all Cottage Creek flows downstream past the Cottage Creek Dam and into New Bullards Bar Reservoir (approximately 1/4 mile downstream of the Cottage Creek Dam). These actions would result in the drainage of the existing Cottage Creek Reservoir. The existing Cottage Creek Reservoir would no longer capture water, but water would continue to move through the area and the former reservoir would function as a wetland.",https://ceqanet.opr.ca.gov/2020080441/3,Cottage Creek Dam Modification Project,Tim Truong,Yuba Water Agency,N/A,TTruong@yubawater.org,1220 F Street,,Marysville,CA,95901,5307407081,39°23'38"N 121°8'54"W,,Yuba,,Access from Emerald Cove Marina (Marysville Road),95931,0.35 acres,064260010000 & 064260013000,N/A,"Cottage Creek, Cottage Creek Reservoir, New Bullards Bar Reservoir",N/A,No,8/26/2020,9/24/2020,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Septic System, Sewer Capacity, Social, Solid Waste, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,