SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020080280,"Water Resources, Department of",California Department of Water Resources,DWR,Tule Subbasin Groundwater Monitoring Well Installation Project,NOE,8/17/2020,8/17/2020,"The Tule Subbasin Well Installation project consists of installing nested groundwater monitoring wells at two locations. Each well site will be marked by Underground Service Alert, then hand tools will be used to excavate a minimum depth of 5 feet. A driller will use a truck-mounted drill rig to drill a pilot hole while using a mud cleaner to filter out solids and return drilling mud to the drill bit. The pilot hole desired depths below ground surface are 1,200 feet for Pixley ID and 1,550 feet for LTRID. Based on logging results, the driller will expand the borehole to selected depths to a diameter large enough to accommodate nested well casings (approximately 14 inches). Within each borehole PVC casings, sand, and a bentonite seal will be constructed. For a final sanitary seal, neat cement will be pumped from the support truck to fill the annular space between the casings and the borehole wall to a depth required by the local well permitting process. A raised steel well protective cover and concrete pad, approximately four feet by four feet in area and four inches tall with four approximately 3-foot high metal crash posts will be installed at ground level to protect the well from potential damage. See NOE for Full Details.",https://ceqanet.opr.ca.gov/2020080280/2,Tule Subbasin Groundwater Monitoring Well Installation Project,Steven Springhorn,Department of Water Resources,N/A,,"901 P Street, Room 313B",,Sacramento,CA,95814,9166519273,,,Tulare,,,,,,,,,,,,,,,,,Categorical Exemption,15306,Work activities will consist of installation of three groundwater monitoring wells. Project activities are covered under Categorical Exemption Class 6 Section 15306 (Data Collection) of the California Environmental Quality Act. No sensitive biological or cultural resources have been identified in the areas.,,,,,,,,,,,,